Soffione Villa

Soffione Villa is our latest residential project at Senadin area which consist 2 types of design: 44 units of Double Storey Terrace Houses & 4 units of Double Storey Semi-Detached.

Feel free to contact our sales hotline at 013-833-7788 for more info.


____________________________________________________________________________

Building Specifications

Specifications A B
Building Structure Reinforced concrete structure / red brickwall    
Roof Concrete roofing tiles. Metal roofing sheets to car porch    
Ceiling Finishes Gypsum plaster ceiling to all. Asbestos free fibre cement board ceiling to roof eaves and car porch.    
Floor Finishes Quality floor tiles to ground floor and first floor. Cement screed to car porch.  
  Homogeneous tiles to car porch  
  Quality floor tiles to entry porch, living, dining, kitchen, guest room, study room, laundry and all bathrooms.  
  Quality laminated flooring to staircase, family hall and first floor bedrooms  
Wall Finishes Ceramic tiles to ceiling height for all bathrooms.    
  Ceramic tiles to 1.5m height for kitchen    
  weather resistant paint to exterior wall    
  Emulsion paint to interior wall    
Doors Decorative wooden door with decor double lock to entrance
 
 
  Decorative wooden door with quality ironmongery to the rest  
 
Windows Natural anodized aluminium frame with green tinted glass    
Plumbing Double bowl stainless steel sink to kitchen    
  Concealed plubing, wash basin, water closet and shower rose    
Electrical 3 phse power supply    
  Concealed conduit, wiring, socket points and switches    
Water Tank 1000 litres stainless steel water tank or equivalent    
Fencing & Gate 1.5m brick wall with metal fencing and stainless steel main gate to front    
  1.5m chain link to back yard internal and rear fencing    
  1.5m brick wall to car porch internal and side fencing near to road side    
       

Remarks:

Type A : Double Storey Terrace & Corner

Type B : Double Storey Semi-Detached

Note: The selling price is not inclusive of natural gas piping, natural gas supply, lightings, fittings, electricity and water meter deposits and connection fees, external landscaping and all the furnishing items in the show house.

Location

Soffione Villa Click image to view larger

Site Plan

Soffione Villa Click image to view larger

Plan

Soffione Villa Click image to view larger
Soffione Villa Click image to view larger
Soffione Villa Click image to view larger
Soffione Villa Click image to view larger
Foundation works completed. Foundation works completed.
Ground floor slab, ground floor columns completed. Ground floor slab, ground floor columns completed.
Ground floor brickwall in progress; First floor slab & roof beam completed. Ground floor brickwall in progress; First floor slab & roof beam completed.
First floor slab, roof beam and brick walls in position; Internal & external plastering in progress. First floor slab, roof beam and brick walls in position; Internal & external plastering in progress.
Internal and external plastering completed. Internal and external plastering completed.
Roofing in progress. Roofing in progress.
Show unit ready for viewing. Show unit ready for viewing.

February Progress: Foundation works completed. (Lots 11388-11394)

March Progress: Ground floor slab, ground floor columns (Lots 11388-11394)

April Progress: Ground floor brickwall is progress, First floor slab & roof beam completed.

April Progress: Foundation works completed. (Lots 11395-11402)

June Progress: Ground floor slab, ground floor columns completed (Lots 11395-11402)

July Progress: First floor slab, roof beam and walls in position (Lots 11388-11394)

July Progress: Foundation works completed (Lots 11403-11409)

July Progress: External plastering completed (Lots 11388 - 11394)

August Progress: Internal plastering, electrical conduits (without wiring) and plumbing (without fittings) completed (Lots 11388 - 11394)

October Progress: Ground floor slab, ground floor columns completed (Lots 11409-11415)

October Progress: Ground floor slab, ground floor columns completed (Lots 11403-11408)

October Progress: First floor slab, roof beam and walls in position (Lots 11395-11402)

November Progress: Foundation works (Lots 12709 - 12714)