Midori Luak [*SOLD OUT PROJECT]

 

Located at Jalan Aru Road, Luak Bay with Double Storey Semi-Detached design, this development provided a serene, unique experience where one can live, learn & leisure; enabling one to explore and experence nature's offerings.

 


Building Specifications

Specifications Type
A B1 B2
Building Structure - Reinforced concrete structure      
Brick - Burnt Clay Brick      
Plastering - Skim coated finishing to all internal wall      
Roofing - Concrete roofing tiles      
Ceiling - Gypsum plastered ceiling to all, UAC superflex ceiling to roof eaves      
Windows - Champagne color anodized aluminum frame with green tinted glass      
Doors - Custom made enlarged solid decorative door with décor double lock to entrance;      
  - Custom made solid decorative door with quality ironmongery to the rest.      
Floor Finishes - 600 x 600mm polished tiles to living, dining, guest room and dry kitchen;      
  - 300 x 600mm ceramic tiles to wet kitchen, utility, entry porch and porch;      
  - 400 x 400mm ceramic tiles to store and balcony;      
  - 300 x 300mm ceramic tiles to master bathroom;      
  - 250 x 250mm ceramic tiles to others bathrooms,      
  - 300 x 300mm homogeneous tiles to car porch;      
  - Laminating flooring to all bedrooms, hall and staircase.      
Wall Finishes - 400 x 400mm ceramic wall tiles to ceiling height at wet kitchen;      
  - 250 x 400mm ceramic wall tiles to ceiling height at master bathroom;      
  - 250 x 330mm ceramic wall tiles to ceiling height to other bathrooms.      
Painting - Weathershield paint to exterior wall; emulsion paint to interior wall      
Sanitary Installation - Double bowl stainless steel kitchen sink 1 1 1
  - Wash basin 4 5 5
  - Shower rose 4 5 5
  - W.C. 4 5 5
Electrical Installation - Lighting point 28 28 28
  - 13A power points 14 14 14
  - Telephone point 2 2 2
  - TV point 2 2 2
  - Gate light point 2 2 2
  - Door bell point 1 1 1
  - Wiring for autogate / alarm / water pump 1 1 1
  - 15A aircon power point with drain pipe ready 6 6 6
Plumbing Works - Conduit PA pipe for hot and cold water supply.      
  - Hot water piping to shower, wash basin and kitchen sink.      
Electrical - 3 Phase wiring      
Gas Piping - Internal gas piping to meter stand.      
Water Tank - 1000 litres “AquaStor” HDPE water tank.      
Fencing & Gate - Designed wrought iron gate and brickwall fencing with designed wrought iron grill to front;      
  - 6’ brickwall to external party wall, side and rear      

 

Note: The selling price is not inclusive of lightings, fittings, electricity and water meter deposits and connection fees, and all the furnishing items in the show house.

Location

Midori Luak [*SOLD OUT PROJECT] Click image to view larger

Site Plan

Midori Luak [*SOLD OUT PROJECT] Click image to view larger

Plan

Midori Luak [*SOLD OUT PROJECT] Click image to view larger
Midori Luak [*SOLD OUT PROJECT] Click image to view larger
Midori Luak [*SOLD OUT PROJECT] Click image to view larger

@ September Progress : Site Clearance

@ October Progress: Pilling Work In Progress

@ November Progress: Pilling Work In Progress

@ November Progress: Pilling Work Completed

@ December Progress: Foundation Works in Progress

@ January Progress: Foundation Works Completed


@ March Progress: Ground Floor Slab, ground floor column in progress (Block A & Block B)

@ April Progress: Ground Floor Slab, ground floor column completed (Block A)

@ April Progress: Ground Floor Slab, ground floor column completed (Block B)

@ May Progress: Ground Floor Slab, ground floor column completed (Block C)

@ June Progress : First Floor Slab, roof beam and walls in position completed (Block A)

@ June Progress : First Floor Slab, roof beam and walls in position completed (Block C)

@ July Progress : First Floor Slab, roof beam and walls in position completed (Block C)

@ August Progress : First Floor Slab, roof beam and walls in position in progress (Block B)

@ September Progress: Roofing, internal plastering, electrical conduits

(without wiring) and plumbing (without fittings) in progress (Block A)

@ October Progress: Roofing, internal plastering, electrical conduits

(without wiring) and plumbing (without fittings) in progress (Block C)

@ November Progress: First Floor Slab, roof beam and walls in position Completed (Block B)

@ December Progress: Roofing in progress (Block C)

January Progress: Driveway, apron, perimeter drain, fencing, gate & painting in

progress (Block B)

March Progress : Fencing in position. (Block D)

June Progress: Driveway, apron, perimeter drain, fencing, gate & painting completed (Block A, B, C)

October Progress: The issuance of Occupation Permit completed.