Midori Luak

 

Located at Jalan Aru Road, Luak Bay with Double Storey Semi-Detached design, this development provided a serene, unique experience where one can live, learn & leisure; enabling one to explore and experence nature's offerings.

 


Building Specifications

Specifications Type
A B1 B2
Building Structure - Reinforced concrete structure      
Brick - Burnt Clay Brick      
Plastering - Skim coated finishing to all internal wall      
Roofing - Concrete roofing tiles      
Ceiling - Gypsum plastered ceiling to all, UAC superflex ceiling to roof eaves      
Windows - Champagne color anodized aluminum frame with green tinted glass      
Doors - Custom made enlarged solid decorative door with décor double lock to entrance;      
  - Custom made solid decorative door with quality ironmongery to the rest.      
Floor Finishes - 600 x 600mm polished tiles to living, dining, guest room and dry kitchen;      
  - 300 x 600mm ceramic tiles to wet kitchen, utility, entry porch and porch;      
  - 400 x 400mm ceramic tiles to store and balcony;      
  - 300 x 300mm ceramic tiles to master bathroom;      
  - 250 x 250mm ceramic tiles to others bathrooms,      
  - 300 x 300mm homogeneous tiles to car porch;      
  - Laminating flooring to all bedrooms, hall and staircase.      
Wall Finishes - 400 x 400mm ceramic wall tiles to ceiling height at wet kitchen;      
  - 250 x 400mm ceramic wall tiles to ceiling height at master bathroom;      
  - 250 x 330mm ceramic wall tiles to ceiling height to other bathrooms.      
Painting - Weathershield paint to exterior wall; emulsion paint to interior wall      
Sanitary Installation - Double bowl stainless steel kitchen sink 1 1 1
  - Wash basin 4 5 5
  - Shower rose 4 5 5
  - W.C. 4 5 5
Electrical Installation - Lighting point 28 28 28
  - 13A power points 14 14 14
  - Telephone point 2 2 2
  - TV point 2 2 2
  - Gate light point 2 2 2
  - Door bell point 1 1 1
  - Wiring for autogate / alarm / water pump 1 1 1
  - 15A aircon power point with drain pipe ready 6 6 6
Plumbing Works - Conduit PA pipe for hot and cold water supply.      
  - Hot water piping to shower, wash basin and kitchen sink.      
Electrical - 3 Phase wiring      
Gas Piping - Internal gas piping to meter stand.      
Water Tank - 1000 litres “AquaStor” HDPE water tank.      
Fencing & Gate - Designed wrought iron gate and brickwall fencing with designed wrought iron grill to front;      
  - 6’ brickwall to external party wall, side and rear      

 

Note: The selling price is not inclusive of lightings, fittings, electricity and water meter deposits and connection fees, and all the furnishing items in the show house.

Location

Midori Luak Click image to view larger

Site Plan

Midori Luak Click image to view larger

Plan

Midori Luak Click image to view larger
Midori Luak Click image to view larger
Midori Luak Click image to view larger

@ September Progress : Site Clearance

@ October Progress: Pilling Work In Progress

@ November Progress: Pilling Work In Progress

@ November Progress: Pilling Work Completed

@ December Progress: Foundation Works in Progress

@ January Progress: Foundation Works Completed


@ March Progress: Ground Floor Slab, ground floor column in progress (Block A & Block B)

@ April Progress: Ground Floor Slab, ground floor column completed (Block A)

@ April Progress: Ground Floor Slab, ground floor column completed (Block B)

@ May Progress: Ground Floor Slab, ground floor column completed (Block C)

@ June Progress : First Floor Slab, roof beam and walls in position completed (Block A)

@ June Progress : First Floor Slab, roof beam and walls in position completed (Block C)

@ July Progress : First Floor Slab, roof beam and walls in position completed (Block C)

@ August Progress : First Floor Slab, roof beam and walls in position in progress (Block B)

@ September Progress: Roofing, internal plastering, electrical conduits

(without wiring) and plumbing (without fittings) in progress (Block A)

@ October Progress: Roofing, internal plastering, electrical conduits

(without wiring) and plumbing (without fittings) in progress (Block C)

@ November Progress: First Floor Slab, roof beam and walls in position Completed (Block B)

@ December Progress: Roofing in progress (Block C)

January Progress: Driveway, apron, perimeter drain, fencing, gate & painting in

progress (Block B)

March Progress : Fencing in position. (Block D)

June Progress: Driveway, apron, perimeter drain, fencing, gate & painting completed (Block A, B, C)

October Progress: The issuance of Occupation Permit completed.

Registration

* this form is mainly served for registration purpose only, which does not guarantee that the preferred property/properties will finally be allocated to the registrant(s).