Registration
* this form is mainly served for registration purpose only, which does not guarantee that the preferred property/properties will finally be allocated to the registrant(s).
The Height II is our future residential project with Guarded & Gated concept, consist 2 types of design: 22 units of Double Storey Semi-Detached and 16 units of Double Storey Terrace.
Please do not hesitate to contact our sale staffs for further information.
______________________________________________________________________________
Building Specifications
Specifications | A | B | |
Building Structure | - Reinforced concrete structure. | ||
Brick | - Burnt clay brick. | ||
Plastering | - Skim coated finishing to all internal walls. | ||
Roofing | - Concrete roofing tiles | ||
Ceiling | - Gypsum plastered ceiling to all, UAC Superflex ceiling to roof eaves. | ||
Windows | - Powder coated aluminium frame with green tinted glass. | √ | |
- Champagne color anodized aluminium frame with green tinted glass. | √ | ||
Doors | - Custom made enlarged solid decorative door with décor double lock to entrance; | ||
- Custom made solid decorative door with quality ironmongery to the rest. | |||
Floor Finishes | - 600 x 600mm polished tiles to living, dining, guest room and dry kitchen; | ||
- 300 x 600mm ceramic tiles to wet kitchen, utility, entry porch and porch; | |||
- 400 x 400mm ceramic tiles to store and balcony; | |||
- 300 x 300mm ceramic tiles to master bathroom; | |||
- 250 x 250mm ceramic tiles to others bathrooms; | |||
- 1’ x 1’ homogeneous tiles to car porch; | |||
- Laminating flooring to all bedrooms, hall and staircase. | |||
Wall Finishes | - 400 x 400mm ceramic wall tiles to ceiling height to wet kitchen; | ||
- 250 x 400mm ceramic wall tiles to ceiling height to master bathroom; | |||
- 250 x 330mm ceramic wall tiles to ceiling height to other bathrooms. | |||
Painting | - Weathershield paint to exterior wall; emulsion paint to interior wall. | ||
Sanitary Installation | - Double bowl stainless steel kitchen sink. | 1 | 1 |
- Wash basin | 3 | 4 | |
- Shower rose | 3 | 4 | |
- W.C. | 3 | 4 | |
- Shower screen | 4 | ||
Electrical Installation | - Lighting points. | 25 | 30 |
- 13A power point. | 15 | 18 | |
- Telephone point. | 2 | 2 | |
- TV point. | 2 | 2 | |
- Gate light point. | 2 | 2 | |
- Door bell point. | 1 | 1 | |
- Wiring for autogate / alarm / water pump. | |||
- 15A aircon power point with drain pipe ready. | 5 | 6 | |
Plumbing Works | - Conduit PA pipe for hot and cold water supply. | ||
- Hot water piping to shower, wash basin and kitchen sink. | |||
Electrical | - 3 phase wiring | ||
Gas Piping | - Internal gas piping to meter stand. | ||
Water Tank | - 1000 litres “AquaStor” HDPE water tank. | ||
Fencing & Gate | - Designed wrought iron gate and brickwall fencing with designed wrought iron grille to front; | ||
- 1.5M brickwall to external party wall, side and rear | |||
Accessories | - Architrave to door and skirting to internal floor. |
Remarks:
Type A : Double Storey Terrace
Type B : Double Storey Semi-Detached
Note: The selling price is not inclusive of lightings, fittings, electricity and water meter deposits and connection fees, external landscaping and all the furnishing items in the show house.
@ January Progress: Earthwork in Progress
@ April Progress: Foundation works completed (Block A)
@ May Progress: Foundation works completed (Block C & D)
@ June Progress: Foundation works completed (Block E)
@ July Progress: Ground Floor Slab, ground floor column Completed (Block C & D)
@ August Progress: Foundation works Completed (Block B)
@ September Progress: Ground Floor Slab, ground floor column completed (Block E)
@ October Progress: First Floor Slab, roof beam and walls in position Completed (Block A)
@ November Progress: Ground Floor Slab, ground floor column in progress (Block B)
@ December Progress: First Floor Slab, roof beam and walls in position
completed (Block C)
@ January Progress: First Floor Slab, roof beam & walls in position in progress (Block B)
@ March Progress : Roofing, internal plastering, electrical conduits (without wiring) and plumbing (without fitings) (Block A)
@ April Progress : Roofing (Block D)
@ June Progress: Roofing, internal plastering, electrical conduits (without wiring) and plumbing (without fittings) completed (Block C)
@ June Progress: Roofing, internal plastering, electrical conduits (without wiring) and plumbing (without fittings) completed (Block E)
@ September Progress: Roofing, internal plastering, electrical conduits (without wiring) and plumbing (without fittings) Completed (Block D)
@ September Progress: Roofing, internal plastering, electrical conduits (without wiring) and plumbing (without fittings) Completed (Block B)
@ October Progress: External plastering, ceiling, doors and windows including glazing, soil drainage and septic tank in progress (Block B & Block D)
November Progress: Driveway, apron, perimeter drain, fencing, gate & painting completed (Block A, Block B, Block C, Block D & Block E)
December Progress: The issuance of Occupation Permit completed.
* this form is mainly served for registration purpose only, which does not guarantee that the preferred property/properties will finally be allocated to the registrant(s).