The Height II

 

 

The Height II is our future residential project with Guarded & Gated concept, consist 2 types of design: 22 units of Double Storey Semi-Detached and 16 units of Double Storey Terrace.

Please do not hesitate to contact our sale staffs for further information.

______________________________________________________________________________

Building Specifications

Specifications A B
Building Structure - Reinforced concrete structure.    
Brick - Burnt clay brick.    
Plastering - Skim coated finishing to all internal walls.    
Roofing - Concrete roofing tiles    
Ceiling - Gypsum plastered ceiling to all, UAC Superflex ceiling to roof eaves.    
Windows - Powder coated aluminium frame with green tinted glass.  
  - Champagne color anodized aluminium frame with green tinted glass.   
Doors - Custom made enlarged solid decorative door with décor double lock to entrance;    
  - Custom made solid decorative door with quality ironmongery to the rest.    
Floor Finishes - 600 x 600mm polished tiles to living, dining, guest room and dry kitchen;    
  - 300 x 600mm ceramic tiles to wet kitchen, utility, entry porch and porch;    
  - 400 x 400mm ceramic tiles to store and balcony;    
  - 300 x 300mm ceramic tiles to master bathroom;    
  - 250 x 250mm ceramic tiles to others bathrooms;    
  - 1’ x 1’ homogeneous tiles to car porch;    
  - Laminating flooring to all bedrooms, hall and staircase.    
Wall Finishes - 400 x 400mm ceramic wall tiles to ceiling height to wet kitchen;    
  - 250 x 400mm ceramic wall tiles to ceiling height to master  bathroom;    
  - 250 x 330mm ceramic wall tiles to ceiling height to other bathrooms.    
Painting - Weathershield paint to exterior wall; emulsion paint to interior wall.    
Sanitary Installation - Double bowl stainless steel kitchen sink. 1 1
  - Wash basin 3 4
  - Shower rose 3 4
  - W.C. 3 4
  - Shower screen   4
Electrical Installation - Lighting points. 25 30
  - 13A power point. 15 18
  - Telephone point. 2 2
  - TV point. 2 2
  - Gate light point. 2 2
  - Door bell point. 1 1
  - Wiring for autogate / alarm / water pump.    
  - 15A aircon power point with drain pipe ready. 5 6
Plumbing Works - Conduit PA pipe for hot and cold water supply.    
  - Hot water piping to shower, wash basin and kitchen sink.    
Electrical - 3 phase wiring    
Gas Piping - Internal gas piping to meter stand.    
Water Tank - 1000 litres “AquaStor” HDPE water tank.    
Fencing & Gate - Designed wrought iron gate and brickwall fencing with designed wrought iron grille to front;    
  - 1.5M brickwall to external party wall, side and rear    
Accessories - Architrave to door and skirting to internal floor.    


Remarks:

Type A : Double Storey Terrace

Type B : Double Storey Semi-Detached

Note: The selling price is not inclusive of lightings, fittings, electricity and water meter deposits and connection fees, external landscaping and all the furnishing items in the show house.

Location

 

 

The Height II Click image to view larger

 

 

The Height II Click image to view larger

Site Plan

The Height II Click image to view larger
The Height II Click image to view larger

Plan

The Height II Click image to view larger
The Height II Click image to view larger
The Height II Click image to view larger

 

@ January Progress: Earthwork in Progress

@ April Progress: Foundation works completed (Block A)

@ May Progress: Foundation works completed (Block C & D)

@ June Progress: Foundation works completed (Block E)

@ July Progress: Ground Floor Slab, ground floor column Completed (Block C & D)

@ August Progress: Foundation works Completed (Block B)

@ September Progress: Ground Floor Slab, ground floor column completed (Block E)

@ October Progress: First Floor Slab, roof beam and walls in position Completed (Block A)

@ November Progress: Ground Floor Slab, ground floor column in progress (Block B)

@ December Progress: First Floor Slab, roof beam and walls in position

completed (Block C)

@ January Progress: First Floor Slab, roof beam & walls in position in progress (Block B)

@ March Progress : Roofing, internal plastering, electrical conduits (without wiring) and plumbing (without fitings) (Block A)

@ April Progress : Roofing (Block D)

@ June Progress: Roofing, internal plastering, electrical conduits (without wiring) and plumbing (without fittings) completed (Block C)

@ June Progress: Roofing, internal plastering, electrical conduits (without wiring) and plumbing (without fittings) completed (Block E)

@ September Progress: Roofing, internal plastering, electrical conduits (without wiring) and plumbing (without fittings) Completed (Block D)

@ September Progress: Roofing, internal plastering, electrical conduits (without wiring) and plumbing (without fittings) Completed (Block B)

@ October Progress: External plastering, ceiling, doors and windows including glazing, soil drainage and septic tank in progress (Block B & Block D)

November Progress: Driveway, apron, perimeter drain, fencing, gate & painting completed (Block A, Block B, Block C, Block D & Block E)

December Progress: The issuance of Occupation Permit completed.