Green Imperiale

A first real 3 storey Expressed prestigious living of yours together with the precious 3 generation relationship which shall expressed the true value of prestigious living with happiness.


Building Specifications

Specifications Type
A,B & C
Building Structure - Reinforced concrete structure  
Brick - Burnt Clay Brick  
Plastering - Skim coated finishing to all internal wall  
Roofing - “Shingles” roofing tiles with fibre gutter.  
Ceiling - Gypsum plastered ceiling to all, UAC superflex ceiling to roof eaves  
Windows - Powder coated aluminum frame with green tinted glass  
Doors - Custom made enlarged solid decorative door with décor double lock to entrance;  
  - Custom made solid decorative door with quality ironmongery to the rest.  
Floor Finishes - 600 x 600mm polished tiles to living, dining, guest room and dry kitchen;  
  - 300 x 600mm ceramic tiles to wet kitchen, utility;  
  - 400 x 400mm ceramic tiles to store and balcony;  
  - 1’ x 2’ ceramic tiles to master bathroom;  
  - 250 x 250mm ceramic tiles to others bathrooms,  
  - 1’ x 2’ homogeneous tiles to car porch;  
  - Laminate flooring to all bedrooms, hall and staircase.  
Wall Finishes - 1’ x 2’ ceramic wall tiles to ceiling height to wet kitchen;  
  - 1’ x 2’ ceramic wall tiles to ceiling height to master bathroom;  
  - 10” x 13” ceramic wall tiles to ceiling height to other bathrooms.  
Painting - Weathershield paint to exterior wall; emulsion paint to interior wall  
Sanitary Installation - Double bowl stainless steel kitchen sink 2
  - Wash basin 5
  - Shower rose 5
  - W.C. 5
  - Shower Screen 5
Electrical Installation - Lighting point 41
  - 13A power points 33
  - Telephone point 3
  - TV point 3
  - Gate light point 2
  - Door bell point 1
  - Wiring for autogate / alarm / water pump  
  - 15A aircon power point with drain pipe ready 7
Plumbing Works - Conduit PA pipe for hot and cold water supply.  
  - Hot water piping to shower, wash basin and kitchen sink.  
Electrical - 3 Phase wiring  
Gas Piping - Internal gas piping to meter stand.  
Water Tank - 1000 litres “AquaStor” HDPE water tank.  
Fencing & Gate - 7’ Designed wrought iron gate and brickwall fencing with designed wrought iron grill to front,  
  - 6’ brickwall to external party wall, side and rear  
Accessories - Architrave to door and skirting to internal floor.  

Note: The selling price is not inclusive of lightings, fittings, electricity and water meter deposits and connection fees, external landscaping and all the furnishing items in the show house.

Location

Green Imperiale Click image to view larger

Site Plan

Green Imperiale Click image to view larger

Plan

Green Imperiale Click image to view larger
Green Imperiale Click image to view larger
Green Imperiale Click image to view larger
Green Imperiale
Green Imperiale
@ Dining Room @ Dining Room
@ Master Bedroom @ Master Bedroom
@ Dry Kitchen @ Dry Kitchen
@ Living Room @ Living Room
@ Family Hall @ 2nd Floor @ Family Hall @ 2nd Floor
@ Landscaping @ Landscaping

@ Foundation works, ground floor slab, ground floor coloumn

@ First Floor Slab & Coloumn

@ First Floor Slab, first floor column

@ Second floor slab & roof beam

@ Wall in position

@ Roofing stage

@ Internal plastering

@ Sublot 1688 available for viewing

 

@ Green Imperiale Land Mark

@ October Progress: External plastering completed

@ November Progress: Roof Ceiling & Window Panel Installation in Progress

@ March Progress: Roofing, internal plastering, electrical conduits without wiring) and

plumbing (without fittings) in progress

@ March Progress: Roofing, internal plastering, electrical conduits without wiring) and

plumbing (without fittings) in progress

@ April Progress: Driveway, apron, perimeter drain, fencing, gate and painting completed

@ May Progress: Roofing, internal plastering, electrical conduits (without wiring) and

plumbing (without fittings) completed

@ June Progress: Roofing, internal plastering, electrical conduits (without wiring) and

plumbing completed (without fittings) completed

@ August Progress: External plastering, ceiling, doors and windows including

glazing, soil drainage and septic tank completed

@ August Progress: External plastering, ceiling, doors and windows including

glazing, soil drainage and septic tank completed

@ September Progress: The issuance of Occupation Permit completed

(S/L1682 & S/L1683)

@ September Progress: The issuance of Occupation Permit completed

(S/L1684 & S/L1685)

@ October Progress: The issuance of Occupation Permit completed

(S/L1686 & S/L1687)

@ October Progress: The issuance of Occupation Permit completed

(S/L1690 & S/L1691)

Registration

* this form is mainly served for registration purpose only, which does not guarantee that the preferred property/properties will finally be allocated to the registrant(s).