Green Edge Phase II

 

A new lifestyle is blooming near you soon. Green Edge Phase II is our latest residential project comprising of 8 units contemporary double storey semi-detached lots at Lutong, which is situated just opposite of Green Edge.   

Like Green Edge, Green Edge Phase II is an ideal choice for a home with a touch of nature and serenity. Experience the tranquility of our houses which are fill with the best that nature and human imagination has to offer. 

Building Specification

Building Structure - Reinforced concrete structure  
Brick - Burnt clay brick  
Plastering - Skim coated finishing to internal walls.  
Roofing - Concrete roofing tiles with colourbond / fibre gutter  
Ceiling - Gypsum plastered ceiling to all, UAC superflex ceiling to roof eaves  
Windows - Champagne colour anodized aluminium frame with green tinted glass  
Doors - Custom made enlarged solid decorative door with decor double lock to entrance  
  - Custom made solid decorative door with quality iron mongery to the rest  
Floor Finishes - 600 x 600mm polished tiles to living, dining, guest room and dry kitchen;  
  - 300 x 600mm ceramic tiles to wet kitchen, utility, entry porch and porch;  
  - 400 x 400mm ceramic tiles to store and balcony;  
  - 300 x 300mm ceramic tiles to master bathroom;  
  - 250 x 250mm ceramic tiles to others bathrooms;  
  - 1' x 1' homogeneous tiles to car porch;  
  - Engineering flooring to all bedrooms, hall and staircase  
Wall Finishes - 16" x 16" ceramic wall tiles to ceiling height to wet kitchen;  
  - 10" x 16" ceramic wall tiles to ceiling height to master bathroom;  
  - 10" x 13" ceramic wall tiles to ceiling height to other bathroom  
Painting - Weathershield paint to exterior wall;  
  - Emulsion paint to interior wall  
Sanitary Installation - Quality double bowl stainless steel kitchen sink 2 nos
  - Quality wash basin 4 nos
  - Quality shower rose 3 nos
  - Quality W.C. 3 nos
Electrical Installation - Lighting point 26 nos
  - 13A power point 15 nos
  - 15A Air-con power point with drain pipe ready 6 nos
  - Telephone point 2 nos
  - TV point 2 nos
  - Gate light point 2 nos
  - Door bell point 1 no
  - Wiring for auto gate /alarm / water pump  
Plumbing works - Conduit PA pipe for hot and cold water supply  
  (Hot water piping to shower,wash basin,and kitchen sink)  
Electrical - Three phase wiring  
Gas Piping - Internal gas piping to meter stand  
Water Tank - 1000 litres ‘Aquastor HDPE’ water tank  
Fencing & Gate - Designed stainless steel gate and brickwall fencing with desgned stainless steel grill to front;  
  - 6' brickwall fencing to external party wall side and rear.  
Accessories - Architrave to doors and skirting to internal floor.  
Note: The selling price is not inclusive of lightings, fittings, electricity and water meter deposits and connection fees, and all the furnishing items in the show house.

Location

Green Edge Phase II Click image to view larger

Site Plan

Green Edge Phase II Click image to view larger

Plan

Green Edge Phase II Click image to view larger

@ Foundation Works

@ October Progress: Ground floor column in progress

@ November Progress: Ground floor column in progress

@ November Progress: Ground Floor Slab, Ground Floor Column Completed

@ December Progress: First Floor Slab, Roof Beam & Walls in Position in Progress

@ January Progress: First Floor Slab, Roof Beam & Walls in Position in Progress

@ February Progress: First Floor Slab, Roof Beam & Walls in Position in Progress

@ March Progress: First floor slab, roof beam and walls in position in progress

@ April Progress: Roofing, internal plastering, electrical conduits (without wiring)

    and plumbing (without fittings) in progress

@ May Progress: Roofing, internal plastering, electrical conduits (without wiring)

     and plumbing (without fittings) in progress


@ June Progress: Roofing, internal plastering, electrical conduits (without wiring)

     and plumbing (without fittings) in progress

@ July Progress: Roofing, internal plastering, electrical conduits (without wiring)

     and plumbing (without fittings) in progress

@ August Progress: Roofing, internal plastering, electrical conduits (without wiring)

     and plumbing (without fittings) in progress

@ September Progress: Roofing, internal plastering, electrical conduits (without wiring)

     and plumbing (without fittings) in progress

@ October Progress: Roofing, internal plastering, electrical conduits (without wiring)

     and plumbing (without fittings) in progress

@ November Progress: Roofing, internal plastering, electrical conduits (without wiring)

     and plumbing (without fittings) in progress

@ December Progress: Roofing, internal plastering, electrical conduits (without wiring)

and plumbing (without fittings) in progress

@ January Progress:Driveway, apron, perimeter drain, fencing, gate & painting in progress

@ March Progress : Completion of Road maintenance

June Progress: The issuance of Occupation Permit completed.

October Progress: The issuance of Individual Title completed.

Registration

* this form is mainly served for registration purpose only, which does not guarantee that the preferred property/properties will finally be allocated to the registrant(s).