AWalk

AWalk; Business park @ airport is our future commercial project at Airport area : 3 storey shophouse with mix development.

Open for Sales Now !!


Building Specifications

Specifications - Commercial Shoplots
Building Structure - Reinforced concrete frame
Roof - Metal roofing
External Wall - Brick Wall
Internal Wall - Brick Wall
Ceiling - General emulsion paint to soffit of reinforced concrete slab for level 1 & 2
  - Level 3 – generally gypsum board on suspend aluminium tees;
  - Toilets – Asbestos – free cement board
Windows - Natural anodized aluminium – framed windows glazed with colour tinted glass
Doors - Natural anodized aluminium roller shutter to shop front and real
  - Fire rated entrance door to upper  floor
  - Timber door to others
Floor Finishes - Generally cement sand screed
  - Non-slip ceramic tiles to toilet
  - Tiles to five foot way
  - Nosing tiles to staircase
Wall Finishes - Glazed ceramic wall tiles up 1500 mm high for toilets
Paintwork - Internal walls – Emulsion paint
  - External Walls – Weatherbond paint
Sanitary Installation - Sanitary fittings for each floor:
- 1 no wash basin
- 2 nos WC’s
Electrical Installation - Concealed wiring
  - Standard lighting and socket points
  - Single phase power supply

 

Location

 

 

AWalk Click image to view larger

 

 

AWalk Click image to view larger

Site Plan

AWalk Click image to view larger

Plan

Click image to view larger
AWalk
Street View Street View

 

@ July Progress: First floor reinforced concrete, First floor slab & columns of the Shophouse in progress

@ September Progress: First floor reinforced concrete, First floor slab & columns of the Shophouse Completed

@ October Progress: Second floor reinforced concrete,  second floor slab & columns of the Shophouse Completed (Block B & Block C)

@ March Progress: Brickwall of the Shophouse in progress (Block A)

@ April Progress: Roofing of the Shophouse Completed (Block B & Block C)

@ June Progress: Plastering internal wall and external Wall of the Shophouse Completed (Block A)

August Progress: Plastering internal wall & external wall of the shophouses completed (Block B & C)

September Progress: The issuance of Occupation Permit completed.